SCI收录论文: 73篇
EI收录论文: 237篇

近年来发表的代表性论文有:

[1]
Chunbao Chen and Liya Wang, Product Platform Design through Clustering Analysis and Information Theoretical Approach, International Journal of Production Research, Volume 46, pages 4259 – 4284,(SCI:317CT)
[2]
Chunbao Chen and Liya Wang, Integrating rough set clustering and grey model to analyse dynamic customer requirements, Proceedings of the Institution of Mechanical Engineers, Part B Journal of Engineering Manufacture, 2008,2,222(2): 319-332,(SCI:280GK)
[3]
Yu, Li,Wang, Liya,Yu, Jianbo, Identification of product definition patterns in mass customization using a learning-based hybrid approach, International Journal of Advanced Manufacturing Technology, v 38, n 11-12, October, 2008, p 1061-1074,(SCI:347IL)
[4]
Chen, Chunbao,Wang, Liya, Multiple-platform based product family design for mass customization using a modified genetic algorithm, Journal of Intelligent Manufacturing, v 19, n 5, October, 2008, p 577-589,(SCI:351QE)
[5]
Li Yu and Liya Wang, A fuzzy intelligent design retrieving system for customer requirements, Int. J. Computer Applications in Technology, Vol. 33, Nos. 2/3, 2008, pp247-254,(EI:085211806991)
[6]
Li, Y. and Tsung, F. False Discovery Rate-Adjusted Charting Schemes for Multistage Process Fault Diagnosis and Isolation. Technometrics. 2009.
[7]
Z. Lu, N. Bostel. A Facility Location Model for Logistic Systems Including Reverse Flows: the Case of Remanufacturing Activities. Computer & Operations Research. 2007.
[8]
Z. Lu, N. Bostel, P. Dejax. Simple Plant Location Problem with Reverse Logistics Systems. Supply Chain Optimization, Series: Applied Optimization. 2005.
[9]
Liang Ye, Ershun Pan, Lifeng Xi. An adaptive SPC monitoring scheme for DOE-based APC. Journal of Systems Engineering and Electronics. 19(2), 2008.
[10]
Pan Ershun, Ye Liang, Xi Lifeng. Adaptive Control Charts with Variable Parameters for DOE-based APC. International MultiConference of Engineers and Computer Scientists, Vols I and II Book Series: Lecture Notes in Engineering and Computer Science. 2007.
[11]
Xiong S, Goonetilleke RS, Witana CP, and Au EYL. Modelling foot height and foot shape related dimensions. Ergonomics. 2008.
[12]
S Xiong, J Zhao, Z Jiang and M Dong. A prototype computer-aided design system for foot-feature based shoe last customization. International Journal of Advanced Manufacturing Technology. 2009.
[13]
Witana CP, Xiong S, Zhao J and Goonetilleke RS. Foot measurements from three-dimensional scans: A comparison and evaluation of different methods. International Journal of Industrial Ergonomics.2006.
[14]
Zhou X., Xi L., Lee J. Opportunistic Preventive Maintenance Scheduling for a Multi-Unit Series System Based on Dynamic Programming. International Journal of Production Economics. 2009.
[15]
Zhou X., Xi L., Lee J. Reliability Centered Predictive Maintenance Scheduling for a Continuously Monitored System Subject to Degradation. Reliability Engineering and System Safety. 2007.
[16]
Li,S.G. The reliable design of one-piece flow production system using fuzzy ant colony optimization. Computers & Operations Research. 2008.
[17]
Li,S.G. The inventory management system for automobile spare parts in a central warehouse. Expert Systems with Applications. 2008.
[18]
Li, S.G. The enhanced quality function deployment for developing virtual items in massive multiplayer online. Computers & Industrial Engineering. 2007.
[19]
Li, S.G.. Business performance forecasting of convenience store based on enhanced fuzzy neural network. Neural Computing & Applications. 2007.
[20]
Qiang Su, Jing-hua Shi and Sheng-jie Lai. Study on supply chain management of Chinese firms from the institutional view. International Journal of Production Economics. 2008.
[21]
Qiang Su, Shengjie Lai, Jun Liu. Geometric computation based assembly sequencing and evaluating in terms of assembly angle, direction, reorientation, and stability. Computer-Aided Design. 2009.
[22]
Qiang Su. A Hierarchical Approach on the Assembly Sequence Planning and the Optimal Sequences Analyzing. Robotics and Computer-Integrated Manufacturing. 2009.
[23]
Qiang SU. Applying case based reasoning in assembly sequence planning. International Journal of Production Research. 2007.
[24]
CHEN Lu, LANGEVIN Andre, RIOPEL Diane. The storage location assignment and interleaving problem in an automated storage/retrieval system with shared storage. International Journal of Production Research, In press, 2009.
[25]
CHEN Lu, RIOPEL Diane, LANGEVIN Andre. Minimising the peak load in a shared storage system based on the duration-of-stay of unit loads. International Journal of Shipping and Transport Logistics, 2009, Vol. 1, No. 1, pp.20–36.
[26]
CHEN Lu, BOSTEL Nathalie, DEJAX Pierre, XI Lifeng, CAI Jianguo. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal. European Journal of Operational Research, 2007, 181(1): 40-58. (SCI IDS: 155EJ).
[27]
CHEN Lu, CAI Jianguo. Using vector projection method to evaluate maintainability of mechanical system in design review, Reliability Engineering & System Safety, 2003, 81(2): 147-154. (SCI IDS: 703AQ)
[28]
Zuhua Jiang, Junqi Yan, Virtual Fuel-pump Design, Chinese Journal of Mechanical Engineering, v 15, n 1, March, 2002, p 94-96(EI 02417130923)
[29]
Lu ZHEN, George Q. Huang, Zuhua JIANG , Collaborative filtering based on workflow space, Expert Systems with Applications, v 36, n 4, p 7873-7881, May 2009, (EI: 20090811919207)
[30]
Lu ZHEN, Zuhua JIANG, Jun LIANG, Knowledge Grid based Problem Solving Platform, International Journal of Advanced Manufacturing Technology, v 42, n 11-12, p 1217-1229, June 2009(EI 20092912201043,SCI)
[31]
ZHEN Lu, JIANG Zuhua, Huang G. Q., LIANG Jun, Knowledge Acquisition for Product Development in Knowledge Grid, Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science, v 222, n 11, p 2269-2280, November 2008(SCI, EI: 20085111792463)
[32]
JIN Yulan, JIANG Zuhua, HOU Wenrui, Multi-objective integrating optimization research on preventive maintenance planning and production scheduling for a single machine, International Journal of Advanced Manufacturing Technology, 2008,November ,v 39, n 9-10, p 954-964, (EI 20084611707241)
[33]
Chao Liu, Zuhua Jiang, Lu Zhen, Hai Su, A bilateral integrative health-care knowledge service mechanism based on ‘MedGrid’, Computers in Biology and Medicine, Vol. 38, No. 4, April 2008, 446-460, (EI: 20081311174619)
[34]
J. Liang, Z. H. Jiang, Y. S. Zhao, K. M. Wang, The acquisition and application of similarity knowledge based on consultation in engineering product design, International Journal of Advanced Manufacturing Technology, v 37, n 1-2, p 1-14, April 2008, (SCI,EI: 20082011257929)
[35]
Huang Runqing, Xi Li-Feng, The framework, impacts and commercial prospects of a new predictive maintenance system: Intelligent Maintenance System, International Journal of Production Planning and Control, 2005,16(7): 652-664. (SCI 986IJ , EI 06019628572)
[36]
Z. Binghai, X. Lifeng, A heuristic algorithm to batching and loading problems in a flexible manufacturing system, International Journal of Advanced Manufacturing Technology, 2004,23 (11-12): 903–908. (SCI 829DZ, EI04308280903)
[37]
Zhou. Bing-hai, Xi. Li-feng, A framework of order evaluation and negotiation for SMMEs in networked manufacturing environments, International Journal of Computer Integrated Manufacturing, 2007, 20(2-3): 199-210.(SCI 162DX, EI 071310515568)
[38]
Runqing Huang, Lifeng Xi, C. Richard Liu, Jay Lee. Prognostics for ball bearing based on neural networks and Morlet Wavelet, Materials Science Forum 2005, (505-507): 1153-1158 (SCI BDT79, EI 8907282)
[39] ZHOU Bing-hai, XI Li-feng. A beam-search-based algorithm for the tool switching problem on a flexible machine, International Journal of Advanced Manufacturing Technology, 2005, 25(9-10):876-882.(SCI 921VE, EI 05209098737)
[40]
Shichang Du, Lifeng Xi, Ershun Pan, and C. Richard Liu. Product Lifecycle-Oriented Quality and Productivity Improvement Based on Stream of Variation Methodology. Computers in industry,2008,59(2-3):180-192. (SCI , EI 080311021458)
[41]
Wang Shi-jin, Xi Li-feng, Zhou Bing-hai. Filtered-Beam-Search-Based Algorithm for Dynamic Rescheduling in FMS. Robotics and Computer-Integrated Manufacturing. 2007 23(4): 457-468 (SCI 167GS, EI 071310518770)
[42]
Wu Bin, Zhou Bing-hai, Xi Li-feng. Remote multi-robot monitoring and control system based on MMS and Web Services. Industrial Robot – An International Journal. 2007, 34(3): 225-239. (SCI 176NY, EI 071310515568)
[43]
Yu Jianbo, Wang Shijin, Xi Lifeng. Evolving artificial neural networks using an improved PSO and DPSO. Neurocomputing, 2008, 71(4-6):1054-1060. (EI 080611080210)
[44]
Runqing Huang, Lifeng Xi, Xinglin Li , C. Richard Liu, Hai Qiu, Jay Lee, Residual life predictions for ball bearing based on Self-Organizing Map and back propagation neural network, Mechanical Systems and Signal Processing, 2006 29(5): 577-583 (SCI 109XZ, EI 064210180561)
[45]
Du Shi-chang, Xi Li-feng, Shi Jian-jun. Distributed sensor system for fault detection and isolation in multistage manufacturing systems. International Journal of Computer Applications in Technology, 2006, 25(4):182-191 (EI 06219898533)
[46]
Xiaojun Zhou, Lifeng Xi, Jay Lee, A dynamic opportunistic maintenance policy for continuously monitored systems, International Journal of Quality in Maintenance Engineering, 2006, 12(3): 294-305 (EI 9128271)
[47]
Shichang Du, Lifeng Xi, Ershun Pan, and C. Richard Liu. Modeling and Control of Dimensional Quality of A Serial Multi-station Machining System, International Journal of Reliability, Quality and Safety Engineering, 2006,13(5):399-420. (EI 064710255253)
[48]
Shichang Du, Lifeng Xi, Ershun Pan, Diagnosability Study for Quality Improvement based on Distributed Sensing and Information Technology. International Journal of Computer Applications in Technology, 2007, 28(2-3), 117-127 (EI 9653883)
[49]
ZHOU Bing-hai, WANG Shi-jin, XI Li-feng. Data model design for manufacturing execution system. Journal of Manufacturing Technology Management, 2005, 16(8):909-935 (EI 05479487413)
[50]
Na Geng and Zhibin Jiang*, Stochastic Programming Based Capacity Planning for Semiconductor Wafer Fab. with Uncertain Demand and Capacity, European Journal of Operational Research, 2009, 198(3), : 899-908 (IF 1.627)
[51]
Yanfei Lee, and Zhibin Jiang*, Multiple-Objective Scheduling and Real-Time Dispatching for the Semiconductor Manufacturing System, Computers & Operations Research , 2009, 36 (3), 866–884. (SCI收录, IF 1.36).
[52]
Yan Ye, Zhibin Jiang*, Xiaodi Diao, Dong Yang, Gang Du, An ontology-based hierarchical semantic modeling approach to clinical pathway workflows, Computers in Biology and Medicine, 39 (2009):pp722 -- 732. (SCI收录,IF1.272)
[53]
Liu Ran, Jiang Zhibin*, Chen Feng, and Richard Y. K. Fung, Two-phase Heuristic Algorithms for Full Truckloads Multi-depot Capacitated Vehicle Routing Problem in Carrier Collaboration, Computers & Operations Research已录用, 2009.
[54]
Huai Zhang, Zhibin Jiang* and Chengtao Guo, An Optimized Dynamic Bottleneck Dispatching Policy or Semiconductor Wafer Fabrication, International Journal of Production Research, 2009, 47(2): 3333 – 3343. (SCI收录,IF 0.774)
[55]
Na Geng and Zhibin Jiang*, A Review on Mid- and Short-term Capacity Planning for Semiconductor Manufacturing Industry, International Journal of Production Research, 2009,47(13):pp13639 – 3655. (SCI收录,IF 0.774)
[56]
Lin Li and Zhibin Jiang*, Self-adaptive dynamic scheduling of virtual production systems, International Journal of Production Research, 45(9), May 2007: 1937–1951. (SCI 052QJ,IF 0.774)
[57]
Lin Li and Zhibin Jiang*, Formal design and analysis of a hybrid supervisory control structure for Virtual Production Systems, International Journal of Production Research, Vol. 44, No. 13, 1 July 2006, 2479–2497. (SCI 052QJ, IF 0.774)
[58]
Furong Tan; Zhibin Jiang, and Suk Joo Bae; Generalized Linear Mixed Models for Reliability Analysis of Repairable Systems, IEEE Transactions on Reliability, 56(1), March 2007, pp 106-114. (SCI 152OV, IF 1.315)
[59]
Hu, Hongtao; Jiang, Zhibin*; Zhang, Hua, A dynamic WIP control strategy for bottlenecks in wafer fabrication system, International Journal of Production Research录用, June, 2009.
[60]
Jiang, Z. B., Zuo, M. J., Fung, Richard Y. K., and Tu, Y. L., Temporized Colored Petri Nets with Changeable Structure (CPN-CS) for Performance Modeling of Dynamic Production Systems, International Journal of Production Research, 38(8), May 2000, pp1917-1945. (SCI 319WT)
[61]
Jiang, Z. B., Zuo, M. J., and Tu, Y. L., Colored Petri Nets with Changeable Structures (CPN-CS) and their Applications in Modeling One-of-a-Kind Production (OKP) Systems, Computer and Industry Engineering, 41(3), Dec. 2001, pp.279-308. (SCI收录,493GD, IF1.057)
[62]
Feng Liang , Richard Y K Fung*, Zhibin Jiang, T. N. Wong, A Hybrid Control Architecture and Coordination Mechanism in Virtual Manufacturing Enterprise, International Journal of Production Research, 46(13), pp3641-3663, July 2008
[63]
Liu H. R., Fun R. Y. K, and Jiang Z. B*., Modeling of semiconductor fabrication systems by extended object-oriented Petri nets, International Journal of Production Research, 43(3), Feb, 2005, pp.471-495.(SCI收录,890ON)
[64]
Huiran Liu, Zhibin Jiang*, and Richard Y. K. Fung, The Infrastructure of the timed EOPNs-based Multiple-objective Real-time Scheduling System for 300mm Wafer FAB, International Journal of Production Research, 45(21), Nov. 2007, 5017-5056.
[65]
Huiran Liu*, Zhibin Jiang, and Richard Y.K. Fung, Performance modeling, real-time dispatching and simulation of wafer fabrication systems using timed extended object-oriented Petri nets, Computers & Industrial Engineering, 56 (1), p.121-137, Feb 2009. (SCI收录,IF1.057)
[66]
Fung, Richard Y. K*. Jiang, Z. B., Zuo, Ming J. and Tu, Paul Y. L., Adaptive Production Scheduling of Virtual Production Systems Based on Object-Oriented Petri Nets with Changeable Structure Modeling, International Journal of Production Research,40(8), pp.1759-1785, May 2002。(SCI收录, 556TN)
[67]
Lin Li and Zhibin Jiang*, A hybrid supervisory control approach for virtual production systems, International Journal of Advanced Manufacturing System, 32( 9-10), April 2007: 1034-1044. (SCI 152KW)
[68]
Feng Liang and Zhibin Jiang*, Rapid reconfiguration of job production control system based on soft component technology, International Journal of Advanced Manufacturing System, 30(11-12), Oct. 2006, pp. 1154-1164。(SCI 094DI)
[69]
Zhiying Zhang, Zhibin Jiang*, and Chengquan Y, Automated Flame Rectification Process Planning System in Shipbuilding Based on Artificial Intelligence, International Journal of Advanced Manufacturing System, 2006, V30(12-12) 1119-1125. (SCI 094DI)




您是第位来访者